Small Business
Governance taking shape, first HR structures, leadership with more layers. The method runs in its standard version — recommended tools become expected, and review cycles are more frequent.
Operational roadmaps differentiated by size — which tools to activate, in what order and with what workload, for each client profile.
Version 1.0 · May 2026 · Internal use — PRISMA consultant
Limited resources, centralised decisions, immediate impact. The method runs in a lean version — every tool chosen must deliver maximum traction for minimum time investment.
Governance taking shape, first HR structures, leadership with more layers. The method runs in its standard version — recommended tools become expected, and review cycles are more frequent.
Multiple units, distributed leadership, structured HR, an ESG and reporting context. The method runs in its expanded version — optional tools become mandatory, and the governance architecture is complete.
No phase moves forward without this tool applied and documented.
Expected for the profile. Omission must be justified in the report.
Applied according to specific demand or the client's context.
Triggered by a defined trigger — decision documented in the previous phase's report.
A previous phase's result used as input — not reapplied, only consulted.
| Tool | Micro | Small | Mid-sized |
|---|---|---|---|
| F11/F13 — Racial Intelligence | Optional (Phases I and O) | Optional (Phase I) / Mandatory (Phase O) | Mandatory (Phases I and O) |
| F12 — Integration Radar | Recommended | Recommended | Mandatory |
| F15 — Transformation Index | Conditional (if HR data exists) | Recommended | Mandatory |
| F16 — Social Impact Map | Recommended (if ambition declared) | Mandatory | Mandatory |
| F17 — Competitive Analysis | Optional | Optional (recommended in O) | Mandatory |
| F19 — Impact Evolution | Recommended (annual) | Mandatory (annual) | Mandatory (annual) |
| F20 — Measurement Architecture | Scorecard + basic triggers | Recommended | Mandatory (complete) |
| F27 — Guardians System | 1–2 informal | 1–2 formal | Full network (4 profiles) |
| F15 trigger | Indicator slipping back | Stalled 2+ cycles | Stalled 1 cycle |
| Scorecard — metrics | 4–6 | 8–12 | 15–33 |
| Review cycle | Every six months | Quarterly | Quarterly + continuous dashboard |
| Letter | Phase | Central Question | Key Deliverable |
|---|---|---|---|
| I | Immersion | What is happening with racial equity in this organisation — and why? | Qualitative map of racial issues + narrative baseline |
| M | Mapping | At what verifiable level is each dimension? | Quantitative profile by dimension + inconsistencies + official baseline |
| P | Purpose | What racial purpose is authentic and capable of producing real transformation? | Racial purpose formulated + inclusive values + opportunity zone |
| The | Architecture | How do you structure systems that run even without the consultant present? | Scorecard set up + Guardians System + RACI approved |
| C | Creation | How does the brand act externally to make racial equity visible? | Suppliers hired + community partnership + touchpoints addressed |
| T | Transformation | Can the organisation operate on equity with growing autonomy? | Scorecard cycles + autonomous Guardians + tabletop simulation |
| O | Originality | How do you communicate real differentiation, built on evidence? | Market positioning + verifiable differentiation + evolution report |
This document is the standalone visual version of the Metodologia IMPACTO PRISMA navigation flowcharts — part of the navigation triad together with the Phase ↔ Tool Navigation Matrix and the Decision Guide by Client Profile.
The consultant uses this document during client onboarding to decide, together with the client, which path to take — considering size, available resources, context and goals. The choices made in that conversation must be documented in the initial report.
Sequence before speed: the flowcharts show the minimum order required. Skipping phases without explicitly documenting why undermines methodological coherence and the integrity of the final report.
No fabricated data: completion criteria are verifiable. No phase progression is legitimate unless the criteria on the corresponding list are met or any omission is justified in writing.